RM13077316469147DC 500V Multimeter Digital Voltmeter Ammeter Battery Charging Coulometer Power Energy Watt Volt Amps Voltage Meters
DC 500V Multimeter Digital Voltmeter Ammeter Battery Charging Coulometer Power Energy Watt Volt Amps Voltage Meters
The instrument panel can be powered by means of a standard 5V energy adapter (such as a cell phone charging head), you can also use the USB port at the dimension board for the exhibit panel strength supply
The tool throughout the charging and discharging relay interface with its own relay can be done automatically swap payment and discharge, you also can manually switch by way of pressing the button fee and discharge
The software has a complete of 18 functions, every single function to help prospects extra convenient and quicker entry to more accurate measurement results (Don&;t have the temperature dimension function )
(1) NCP: set the price of price over-current protection, with the relay could be executed when charging over-current protection;
(2) OCP: set the discharge over-current protection value, with the relay can be accomplished when the discharge over-current protection;
(3) OVP: Set the fee overvoltage defense cost (the voltage exceeds the set voltage can automatically fill the capacity), with the relay would be full of automatic disconnection function;
(4) LVP: set the release over-voltage protection value, with the relay would be completed routinely disconnect the release function;
(5) OUT: The change output function of the wi-fi control relay would be realized by clicking OUT
(6) LCK: key lock function, if necessary, you could possibly lock the keys to prevent misoperation;
(7) BAT: the default complete battery capacity; reference cost as a share of capacity;
(8) BPC: preset ultimate battery means percentage and final battery capacity;
(9) CER: current go back to zero function, when the no-load latest isn't 0, you could possibly click on this option to clean the current;
(10) RET: WH and run-time price reset function, to facilitate a higher measurement;
(11) LNG: language switching function, the instrument has integrated Chinese and English languages, you can swap languages through this option;
(12) STI: set the relay power-on default state, open or closed;
(13) SFH: machine search function, via this option can be one-to-many communication;
(14) DEL: set the relay put off working time; to achieve the protection of the relay put off action
(15) FCH: communique address amendment function, if multiple groups of modules at the similar time each group of modules to set a unique handle to stop interference;
(16) SNR: set the display screen current, when the SNR is bigger than 0, and the display time value is not 0, you could achieve automatic display screen function, and when the charging current is less than this value, the cumulative charging capability is not to circumvent floating payment The affect of the ability value, when the current is greater than this value LCD display mechanically lit
(17) SNT: Set the screen time value When the SNT value is 0, the LCD panel never is going out When the SNT value is bigger than zero and the SNR also is more than 0, the automated screen and brilliant screen applications would be discovered
(18) RFS: reveal color switch function, this instrument has two shade matching prospects can favor different colour per their personal tastes
The leading features
1, wireless transmission of data, to circumvent the complicated wiring between the display and detection modules to convey interference, while wiring is extra clear-cut
2 Hall sensor is used to achieve non-contact detection recent without disconnecting wires, which is safe, dependable and convenient
3, voltage, current, power, temperature, capacity, percentage of remaining capacity, working time is displayed on the similar time
4, double relay interface, you could possibly handle price and discharge separately
5, with price over voltage, discharge under voltage, charge over-current, discharge over-current defense
6 The memory operate of the breakpoint, power-on and power-off, and the variety of AH and WH earlier than power-off could be memorized
Project parameters
Display:2 inch TFT LCD show
Self-power dimension fluctuate of 6V ~ 80V
Measurement vary 0~500V when external power supply
Input recent dimension fluctuate 0~100A
External supply voltage 6-60V
Display mode 2 inch coloration LCD demonstrate
Voltage 0~500V
Current 0~50A 100A 200A 300A 500A can choose
Capacity 0~65000
Energy 0~9999KWH
Time zero ~ one hundred hours
Power cost 999KW
Temperature 1~100°C
Voltage ± 1% + 2 words
Current ± 2% + 5 words
Temperature ± 1 ℃
Measurement price 5 times / moment
Relay postpone time (0-60)S
Communication distance Open single organization 10 meters
OVP (overvoltage protection) 0~500V
LVP (undervoltage protection) 0~500V
OCP (Charge Overcurrent Protection) 0-500A
NCP (discharge overcurrent protection) 0-500A
Display board length 87 * forty nine * 14 (mm)
Measuring plate size 114 * fifty four * 28 (mm)
1 Remaining battery capability Column eight Accumulated price of single run time
2 Accumulated remaining AH quantity nine Output fame display directory
3 Accumulated Energy
four The time it takes to completely price or discharge the battery (calculated in keeping with payment and discharge latest and capacity)
5 wireless conversation sign indicator
6 Key lock indication
7 Real-time dimension of temperature
A Percentage of Battery Remaining Capacity
B Power value
C operate suggestions listing
D Actual voltage price
E Actual measured latest
1 discharge relay control interface
2 charging relay control interface
3 USB2 interface (for reveal panel energy supply)
four Voltage Measurement Interface
five External strength delivery interface
6 external strength delivery and its personal collection of strength interface
7 relay swap button
Wiring
Note: If the measured battery (power) voltage (6-80) V range would be battery (power) its personal power delivery wiring, if the measured battery voltage is bigger than 80V or less than 6V should be used for exterior energy delivery wiring; voltage if no longer (6-80) V range, please don't use their own energy supply wiring, this will injury the measuring tool
(1) its own strength delivery wiring diagram
NOTE: If the examined battery (power supply) can paintings with its personal power delivery voltage (6-80V) during normal operation, first modify the jumper cap of the ability supply alternative interface to "2W", and then join The fantastic and negative poles of the battery (power supply) are linked to the voltage measurement port “+Bat-”; notice that “+” connects to the fine terminal of the battery (power supply), and “-” connects to the negative terminal of the battery (power supply) The nice and damaging poles of the ability supply mustn't ever be linked Wrong or reverse, the battery (power) is connected to the high quality pole of the load, the unfavorable pole of the battery (power) is attached to the unfavorable pole of the load during the Hall sensor When the current flowing during the Hall sensor and the Hall sensor power-on arrow When the course is the same, the measured current will show a favorable value, otherwise the measured current will reveal a negative cost
(2) External strength delivery wiring diagram
Note: If the voltage differ of the tested battery (power supply) is not in the differ of (6-80V) during normal operation, the external energy delivery connection mode can be used First, regulate the jumper cap of the flexibility delivery choice interface to “3W” to attach the exterior energy delivery Positive and damaging poles are connected to “+Vext-” Note that “+” is attached to the fantastic pole of the external energy supply, and “-” is hooked up to the unfavourable pole of the external strength source; then join the nice and adverse poles of the battery (power supply) to the voltage dimension port “+Bat - "Department, listen to" + "connected to the battery (power) positive," - "battery (power) unfavourable The high quality and negative poles of the battery (power supply) shouldn't be linked wrongly or reversed Connect the wonderful pole of the battery (power supply) to the wonderful pole of the load The detrimental pole of the battery (power supply) is attached to the destructive pole of the burden during the corridor sensor when passing in the course of the hall sensor Of the present direction and the path of the Hall sensor power-up arrow when the measured recent may be displayed as positive, whereas the measured current is displayed as a destructive cost
(3) discharge relay wiring diagram
Note: The relay&;s operating power is equipped through an exterior strength supply If it's related to a relay, it must present an external power delivery with an identical operating voltage as the relay Connect the control port of the relay to the interface of the discharge controller If you would like management the positive side of the discharge, cross the tremendous line throughout the relay If you would like management the damaging aspect of the discharge, connect the unfavorable line to the relay When the relay is on, the OUT lamp It will light, off when off as a reminder
(4) charging relay wiring diagram
Note: The relay&;s working power is equipped by an exterior power delivery If it is related to a relay, it must present an exterior energy supply with an identical operating voltage because the relay Connect the control port of the relay to the interface of the charging controller If you desire to management the superb aspect of charging, move the nice line through the relay If you would like management the unfavorable facet of charging, connect the negative line to the relay When the relay is on, "IN" gentle It will light, off when off as a reminder
Package include:
1pcs Display Module
3pcs 2P cable
1pcs Male to Male usb 2 cable
1pcs tester Module(Include1pcs verify board 1pcs Hall Sensor )