Note
1. Due to assorted light, there'll be a slight distinction in coloration between the picture and the real object.
2. The length is measured manually, and there may be about 5mm error within the real object.
INSTALLATION STEPS
1 the wall and preserve the wall dry.
2. Press the bottom plate to make the wall and the status rubber floor fit.
3. Can be used after for forty eight hours.
Specifications
1. Material: 304 stainless-steel
2. Surface brushed treatment, tough to new scratches
3. Installation method: 3M high calories double-sided paste