Tu tagad redzi preces, kas tiek piegādātas uz United States. Lai redzētu preces, kas tiek piegādas uz citām valstīm, izvēlies atbilstošu piegādes reģionu.
8 tips of the switch8 The major wiring diagram to peer the image three 8 The control strength is derived from usual power,emergency strength cand N phases Ⅰ andⅡ line control energy AC220V related with terminal 102~103,104~105 respectively,102 and 104 are normal strength and emergency energy live line respective Terminal 101,106 are act as signal lamp to regulate the power delivery Note:101 and 106 couldn&;t be linked with any other strains When above(under) input line, under(above)terminalⅠand Ⅱline A,B,C levels may be related with copper strains or strains acting as output instruction of debug the switch9 Connect the traditional power(Ⅰ),emergency power(Ⅱ) to the corresponding copper bar
respectively;① Automatic debuggingNormal strength delivery with electric,emergency strength supply with Electric,switchⅠline change onNormal power delivery with out electric,emergency energy delivery with electric,switch Ⅱswitch onNormal energy delivery with electric,switchⅠ line switch on
(Refer to the change panel white indicating arrowhead)② Remote debuggingPress the bush button SB1,then the switchⅠline switch onPress bush button SB2,then the change Ⅱ line change on③ Automatic/Remote(Manual)debuggingWhen dial the function selection swap to the automated position: the change should act as
the ① item requiredWhen dial the operate selection swap to the remote (manual) position, the change must
act because the ② merchandise required9 When the swap is in the function of swap onⅠline or Ⅱ line,the sign lamp on the panel
should indicate correspondingly;9 After done the debugging,close the power supply firstly,and move the change to the
“0”position by handle(Middle position,refer to the switch panel white indicating
arrowhead)