>>Specification
Measurement Accuracy: 1% plus or minus 2 wordsDisplay: LCD high-definition liquid crystal colour two-color displayViewable Screen Size: 43*25mm178° huge viewing angle (no blind spots for viewing)Measuring Range: DC Voltage: (1) DC0-19, 0-199, 0-600V (need to produce a further operating strength between 5-30V) (2) Measure the voltage between DC5-30V (measurement voltage could be As the working energy supply of the meter, the meter does not should expand the working strength supply, but the size voltage can solely be measured from 5V, and it cannot be measured under 5V you need to start the check from 0V or the measurement voltage is larger than 30V, it's best to upload a collection of 5-30V working energy supply, please pay attention to this level when using it!Direct Current: DC0-1, 0-10, 20A/75mV, 50A/75mV 100A/75mV, 200A/75mV Consumption: ﹤0 Speed: about 2 times in line with secondDimensions: 70*40*39mmInstallation Size: 68*38mmExtreme Working Conditions:Working Temperature: -10~+50℃Working Humidity: 10~80%Working Pressure: 80~106kPa
>>Package Included
1 × DC current and voltage dual show meter
>>Notes
Customers order instruments in the latest measurement vary of 10A (including 10A) The meter has a integrated shunt, and the shopper does not need an exterior shunt when utilizing it If the meter purchased through the shopper has a measuring fluctuate above 10A, there's no shunt contained in the meter, and the shopper needs to purchase one other shunt with an identical specifications because the measuring differ of the meter
For example: if the current dimension differ of the purchased meter is 0-50A, then one other shunt with a specification of 50/75mV should be purchased, and whatever the measured recent is bigger than or less than 10A, it should be related to the bought shunt for use!
When wiring, the user must strictly follow the wiring sequence similar to the wiring diagram (attached with the wiring diagram) The shunt must be connected to the negative pole of the power supply, and the burden to be measured should be linked to the positive finish of the ability delivery The wiring device proven within the wiring diagram will be burned (scrapped)! Once burned, we don't take care of after-sales!