Tu tagad redzi preces, kas tiek piegādātas uz United States. Lai redzētu preces, kas tiek piegādas uz citām valstīm, izvēlies atbilstošu piegādes reģionu.














About NPT thread If visitor from u.s.a. or canada, NPT connection for this shower is available! Brass thermostatic bathe equipment 30*30cm 12 inch stainless head bathe with brass arm brass hand shower brass wall spray shower PVC bathe hose 1 Chrome shade About set up steps 1 to the fundamental size of the embedded box, use particular devices to open the major hole on the strong wall. The hole depth is shown in the figure. It ought to be viewed that the distance between the final handled surface of the wall and the lowest surface of the outlet is between five and 6 2, find out the stainless-steel fixing bracket and lock it on the greater and reduce protruding positions of the embedded area with screws; The reserved size of the wall is 33cmx12cm. 3 shown in the figure, embed the water inlet pipeline, eavesdrop on the up, down, left and right instructions of the embedded box, and the lower holes are sizzling and bloodless water pipes and waterfall water outlet pipes respectively; Above is the tip spray outlet pipe four boiling water is opened to examine whether or not or no longer the left and appropriate inlet pipes are tight and leakless. After adjusting the inlet movement pipe, the stream change is opened to check whether or not or not the mixed outlet pipe is tightly related with out leakage. At an analogous time, modify the horizontal direction of the embedded box and fasten it with a support. five again, verify that the pipeline connection is right and there is no leakage in the water test. After the set up of alternative embedded elements of shower, seal and fasten the embedded field and pipeline with filler. So far, the installation of robust wall embedded box is completed, and take out the plastic protective cover. 6 proven in the figure, paste the ceramic tile, and open 7cmx27cm sq. holes within the middle of the ceramic tile. 7 proven in the figure, install the decorative panel and water leadership switch, set up the water management manage in the middle, and the higher and reduce water distribution handwheels are respectively. 8 installation, verify whether each operate works normally, and wipe the skin of the faucet with soft cloth.









QWQER Express,
USPS,
DHL