220V 4P 400ADual Power Transfer Switch Universal switch ATS
8 Wiring tricks of the change
8 foremost wiring diagram to see the image 3
eight The management energy is derived from normal power,emergency strength cand N phases
8 Ⅰ andⅡ line management energy AC220V related with terminal 102~103,104~105 respectively,102 and 104 are ordinary power and emergency power stay line respective
eight Terminal 101,106 are act as sign lamp to regulate the flexibility delivery Note:101 and 106 couldn&;t be linked with any other traces
8 When above(under) input line, under(above)terminalⅠand Ⅱline A,B,C levels can be connected with copper traces or traces acting as output
nine instruction of debug the change
9 Connect the conventional power(Ⅰ),emergency power(Ⅱ) to the corresponding copper bar respectively;
① Automatic debugging Normal strength delivery with lectric,emergency power supply with Electric,switchⅠline turn on Normal strength supply without electric,emergency strength delivery with electric,switch Ⅱswitch on Normal strength delivery with lectric,switchⅠ line activate (Refer to the swap panel white indicating arrowhead)
② Remote debugging Press the bush button SB1,then the switchⅠline switch on Press bush button SB2,then the change Ⅱ line turn on
③ Automatic/Remote(Manual)debugging
When dial the operate selection change to the automated position: the switch must act because the ① merchandise required When dial the operate choice switch to the remote (manual) position, the change should
act as the ② item required
nine When the swap is within the function of switch onⅠline or Ⅱ line,the signal lamp at the panel must indicate correspondingly;
nine After executed the debugging,close the ability supply firstly,and move the swap to the “0”position by means of handle(Middle position,refer to the change panel white indicating arrowhead)