







Description
NEW ARRIVAL GEYA G2R Din Rail 2P 4P ATS Dual Power Automatic Transfer Switch Electrical Selector Switches Uninterrupted Power 25A forty 63A 110V/220V City Power ⇆ Generator(If use Pure Sine Power Supply Inverter, Power desire above 2000W) G2R ATS Usage Precautions: 1 220V ATS should not be used with a voltage less than 185V, in any other case the coil may possibly burn out 2 110V ATS should not be used with a voltage less than 90V, otherwise the coil might burn out three The swap can't be manually switched when in computerized mode, in any other case the coil may possibly burn out three 4P ATS ensure right connection of phase sequence,otherwise the contacts might burn out General GEYA G2R-63 computerized move switch is a PC category infrequent change-over switch, with two-station design (commonly used for A and standby for B), appropriate for AC methods with AC 50-60hz and rated recent 6A-63A The leading function of the automated move change is when the major power (common energy delivery A) fails, the ATS will automatically swap to the backup energy (Backup strength supply B) to continue working (switching speed <50 milliseconds), which may efficiently remedy the concerns attributable to strength outages When either A and B have electricity, precedence is utilizing A Power NOTE: 1 Manual/automatic operation can ensure the opening and closing functionality of electrical operation, yet in guide operation , there is no warrantly because of the different _opening/closing speeds of the operators In guide operation, there&;s possible for excessive silver alloy loss Therefore, the selector switch should solely be pulled to the manual position in any case power has been bring to an end for inspection and upkeep of the working formula and get in touch with information 2, Normally, pull the selector change to the electric position When manual operation is required, pull the selector switch to the guide function After manual operation is complete, pull the selector swap from the guide function to the automated role The management circuit TSE is immediately energized After the change over is completed, the internal change will damage the coil in the control circuit, and the coil can work usually at 85%-110% of the rated operating voltage Too low enter voltage could cause the coil to overheat and burn out Attention!When guide operation the mode choice swap needs to be in "manual" function Company Information





Review
0 people rated this product
GEYA G2R Din Rail 2P 4P ATS Dual Power Automatic Transfer Switch Electrical Selector Switches Uninterrupted Power 25A 40A 63A






Free shipping & returns
QWQER Express,
USPS,
DHL
Shopping security
- Safe payment options
- Secure privacy
- Secure logistics
- Purchase protection
