Voltage: DC9-24V
PMC Series gasoline emergency close off solenoid valve
Introduction
The valve is a chain of fuel emergency shut off solenoid valves, specifically designed as gas pipe breaker for emergency use It would be related with fuel leaking detection sensor ,fire alarm circuit or different intelligent sensor modules so that on site or remote close down on gasoline supply (manually or automatically) is possible , hence making certain the safety on fuel utilization valve elements an auto-close when solid vibration is detected close,manual operation is required to show at the valve This characteristic meets security laws in the occasion of an twist of fate
1
Suitable fuel types: town gasoline
Closing modes: current impulse or guide
Body: wrought aluminum alloy
Driving Voltage:DC 9-24V
Sealing material:NBR rubber
Close time :<1sec
Operation temperature:-10~50C
Explosion proof mark:Exmb twoT4
Pressure max :10kpa
Lead twine :0
Connection:G1/2",G3/4",G1"
Turn on :manual
Working Principal
When the switch is pressed, the capacitor discharges and give an electrical latest in order that a coil can generate strong magnetic held to pull down the valve, reaching the closing inside one second
Emergency Shut Off Valves
Operation instruction
1 are two ways to shut the valve:
(a)An electrical impulse of 1 sec (DC 9V),or
(b)Press the pink knob (must open the protective cover first ) After this operation, the valve remains closed
Note: the protecting hide must remain on role at all time
2 the valves is closed,manually pull the crimson knob as much as turn it at the valve remains on
Note:the valve may not to be pulled up if gas pressure on either sides(inlet and outlet) isn't balanced Take mandatory motion to make sure that they are balanced ,then pull the knob up again,force pulling it could result in harm to the valve
three valve will shut automatically when it detects strong vibrations Should this selection fails, notify the contractor or manufacture for repair
4 final ,careful inspection is required exercise warning when the valve ought to be grew to become on again
Installation Requirements
1 Only request contractor can set up this valve
2 valve ought to be installed after the indoor leading valve
3 valve needs to be put in within the gasoline movement route marked on the valve physique The coil must not be positioned in downward function A valve could also be installed horizontally or vertically
four the valve control wires needs to be linked wisely White indicates wonderful while black stands for damaging Mismatch lends to deadly penalties
five During pipe maintenance, reminiscent of pressurized pipe cleansing valve should removed to circumvent damages to the valve sealing
6 stress tests, the valve needs to be turned on
7 valve&;s opening knob can be pulled up when equivalent strain had been reached on the inler and the outlet of the valve
eight Wrong polarity, improper voltage or prolonged power on could injury the electromagnetic coil
9 warrantly doesn't consist of any injury to the valve or loss of parts thanks to conserving or activities in violative laws
2 (mm)
Wiring Requirements
1:dual core×0 Or above
2 Length of cable < 50meters
Maintenance
Inspection must be finished regularly,open and shut it ,In case of failure, notify the contractor instantly for repair
Shipment&Payment:
1 We will shipped the parcel in 1-3 days after you made payment
And the ensuing types of payment are authorized by means of Buydo: Credit card, TT, Western Union and Qiwi wallet
2 The shipment is free transport by way of China put up air mail, if the kit weight is more than 2kg or the equipment size is larger than 90CM, we are able to use EMS and so forth or deliver with two parcels or extra parcels by way of air mail
3 Instruction:the weight and length we marked in the package particulars isn't the actual weight and size of the goods, if you'd like to know the actual weight and size, you simply deserve to touch us
4 Delivery time:
1) Transportation developed nations is ready 7-45 days
2) Remote international locations is about 2-8 weeks
five If buyer wish to use extra faster delivery method, like EMS, DHL etc, please communicate with us in regards to the increase transport
6 Instruction:The delivery time is is determined by the buyer&;s customs clearance time or Force Majeure If customer would not get hold of the goods in a long time, we hope customer can contact your customs or native publish office, so as to get goods soon
About Customs:
1 Any import costs or prices are the buyer&;s obligation
2 Suppliers are usually not liable for delays attributable to the customs branch on your country
3 Additional expenses or delays may well happen during foreign trade We sincerely hope that you simply don't use additional import costs or customs clearance delays as a reason behind inquiring for refunds or leaving destructive suggestions
After-sales Service:
We will examine the products high quality earlier than shipment If there are some unforeseen problems happen, we are hoping to solve the problems with buyer through friendly in the following ways:
1 If it's quality problem, buyer can publish argue within 15days after receiving the goods, buyer must provide photographs or video and other evidence to vendor for identify
2 Man-made damaged, shoppers take complete responsibility
three Product quality processing program:
1) The customer return the products to us and responsible for go back transport costs; when we acquire the goods ,we will ship a brand new product to customer and pay for the resend delivery charge
2) If the products (total payment including delivery is less than 10USD) has high quality problems, we will resend a new product in buyer next order; if buyer don&;t plan to make a brand new order in the close to term, customer pays the resend transport charge and ask to resend a brand new product
Feedback:
1 We rely on our customer pride to be triumphant Therefore, your suggestions is incredibly predominant to us
2 If you're convinced with our items, please go away a good suggestions to us We will leave a positive feedback to you later
three Contact us before leaving any negative or neutral suggestions We will cope with you to solve any issues as soon as probable
We work 6 Days every week at 9:00 - 18:30 from Monday - Saturday Beijing Time