General ERV-08M timer relays are used in all fields (industry, house, plant etc) want controlls associated with the time Usage and Working Principle Make the connections in line with the diagram Knob (Time Steps): Time differ alternative knob (t): Time cost Example: Time is seventy five minutes Make "Time Steps" knob to 100m (100 minutes) and make “t” knob between 7-8 In this situation time is adjusted to 75 mins Note: In order to adjust a lot sensitive increased time values, set “t” knob by way of chronometer in low levels and expand the degree to the time required Example: Time is 25 hours "Time steps" knob to 10s (10 seconds) and “t” knob between 2-3 Make power on and consult with a chronometer for two seconds If it is high or low, set “t” knob back Re-check the device Make the "Time steps" knob 100h(100 hours) In this case, you place it extra sensitive After environment the time, strength at the gadget Device will start timing and meanwhile led switches on-off When gadget is timing contact out is (NC) 1 When the timing end (set time is up) relay led mild is switches on and get in touch with out is (NO) 3 Device keeps stable till the power is off Maintenance Switch off the machine and release from connections Clean the trunk of gadget with a swab Don’t use any conductor or chemical may possibly damage the gadget Make sure system works after cleansing Warnings Please use the device in line with the guide Don’t use the device in wet Include a change and circuit breaker in the meeting Put the swap and circuit breaker close by the device, operator can reach smoothly Mark the switch and circuit breaker as freeing connection for system Specifications Operating Voltage(Un): 150V-260V AC/24VDC or 110VAC/24VDC Operating Frequency: 50/60 Hz Operating Power: <4VA Operating Temperature: -20°C+55°C Time(t): 10sec, 100sec, 10min, 100min, 10hr and 100hours Display:: On led and Out led Connection Type: Terminal connection Weight: Max Contact:5A/250V AC (Resistive Load) Mounting: Vertical assembled in the panel or assembled at the din rail Operating Altitude: <2000meter Cable Diameter: 2,5mm² Working Mechanism Dimensions Connection diagram